De-silting of the Brent river for Ealing Council Ranger Team
 
 
 
This project was awarded to us to clear the build up of silt from the Brent River running through Perivale, the build up of silt was so bad that there was only about 2" of flowing water, this was causing major problems to a nearby golf course during periods of wet weather when the banks would overflow, our contract was to remove approximately 800 tonnes and level out on site within one week
 
 
 
 
 
Day 1 - Putting our 13 tonne Hitachi excavator into the Brent River
 
 
 
 
 
 
 
First bucket of silt removed, it took one full week for completion
 
 
 
 
 
 
 
Finished project
The river bed is now half a metre lower than on day 1